The whole job, from the first figure to the last receipt.

Here is a renovation run in Cobblewood, in the order it happens, on an example kitchen. Every figure on this page is one a member types in. Nothing is estimated for you.

Step 1 of 7

Write down the total, and hold some of it back.

Begin with the most you are prepared to spend on the job, all in. Then set a contingency to one side: money nobody has spoken for yet, kept for the rot behind the tile or the wiring that is not to code.

Whatever remains is the room the line items have to fit inside. How much to hold back is your call; the contingency guide walks through the thinking.

$42,000

Kitchen total, example

All in
$42,000
For the work itself
$38,500
Held back
$3,500

Your numbers, written down. Not an estimate.

Step 2 of 7

Break the work into lines, and name the allowances.

Each trade or purchase gets its own line with its own figure. Where a finish is not chosen yet, the line is an allowance: a placeholder, like $4,800 for countertops before anyone has picked the slab.

Cobblewood marks every allowance, so you always know which figures are firm and which are still a guess. More on allowances

$4,800

Line items, example

Line items for the example kitchen, with the allowance marked
LineKindFigure
Cabinetsfirm$14,200
Countertopsallowance$4,800
Electricalfirm$3,900
Plumbingfirm$3,100
Laborfirm$9,600
Demolitionfirm$1,800
Permitsfirm$1,100
Seven lines$38,500

Step 3 of 7

Type in each quote against the same lines.

When quotes arrive, enter each one line by line, including the lines a quote leaves out. Set side by side, differences in scope show up before differences in price.

In the example, the lowest quote is $6,200 under the others on paper, and blank on four of seven lines.

Try the bid lineup with your own figures

$6,200

Which lines each quote covers, example

Your numbers, written down. Not an estimate.

Step 4 of 7

Log each payment on the line it pays for.

Four kinds of entry cover a whole job. Each one goes against a line, so every line always knows what it has used and what it has left.

You type these in yourself. Cobblewood has no link to a bank or a card, and it never pays anyone.

Four kinds of entry, example

  • Deposit

    Holds a trade's place in the schedule before work begins.

    CabinetsMar 3$4,260

  • Progress payment

    Goes out in stages as the work gets done.

    LaborApr 21$4,320

  • Receipt

    Anything you bought yourself, from fixtures to a box of screws.

    PlumbingMay 8$1,550

  • Change order

    A change to the agreed work, with its price. Kept in its own log on Plus.

    CountertopsMay 12$1,400

Your numbers, written down. Not an estimate.

Step 5 of 7

When a line runs over, you hear about it plainly.

The moment an entry takes a line past its figure, Cobblewood flags that line in the app and sends you an email. Both say the same three things: which line, how far over, and how much contingency is left to absorb it.

No sirens and no red screens. You see the size of the problem early enough to pick a plainer sink or trim another line.

$1,400

In the app, example

Countertops allowance

$4,800 figure$6,200 loggedover by $1,400

Covered by contingency: $2,100 of $3,500 still unspent.

By email, example

From
Cobblewood
Subject
Kitchen: countertops went past the allowance

The change order you logged on May 12 took countertops to $6,200, which is $1,400 past the $4,800 allowance.

The contingency covers it. After this entry, $2,100 of the $3,500 remains.

Your numbers, written down. Not an estimate.

Step 6 of 7

Close the project, and keep the real numbers.

With the punch list done, close the project. The report sets each line's final cost against its figure, shows what the contingency paid for, and gives the bottom line in one place.

Free shows the report in the app. Plus exports it as a file to keep with the house papers.

$39,900
Planned
$42,000
Came in at
$39,900
From contingency
$1,400
Never spent
$2,100

Kitchen, example

Read the full report in the Report view

Step 7 of 7

Run it with a partner, on Plus.

Invite a partner to the project and you both work from the same lines. Either of you can log a receipt at the hardware store; the other sees it on the line and in the totals straight away.

You both see one set of flags and one final report, because you share one set of numbers.

Shared project, example

Entries on a shared project, showing who logged each one, example
Logged byEntryDateAmount
YouDepositCountertopsApr 2$2,400
PartnerReceipt: fixturesPlumbingMay 8$1,550
YouProgress paymentLaborMay 9$960
PartnerChange order: countertop edge and cutoutCountertopsMay 12$1,400

Your numbers, written down. Not an estimate.

One project, seen four ways.

The app's own layout, built here in HTML with the example kitchen. Switch views to read the same job as a budget, a bid lineup, a log, and a finished report.

Use the tabs, or the arrow keys once a tab has focus. Figures match every other example on this site.

4 views
Kitchen, example
Budget
$42,000
Logged so far
$39,900
Contingency left
$2,100
Each line's figure against what has been logged on it, example
LineUsedLoggedFigureStatus
Cabinets$14,200$14,200paid in full
Countertopsallowance$6,200$4,800$1,400 over
Electrical$3,900$3,900paid in full
Plumbing$3,100$3,100paid in full
Labor$9,600$9,600paid in full
Demolition$1,800$1,800paid in full
Permits$1,100$1,100paid in full
Contingency$1,400 used$3,500$2,100 unspent

Your numbers, written down. Not an estimate.

Run one room free. Add Plus when the job asks for it.

Free runs one active project: the total, the held-back contingency, every line item, and a log of payments and receipts. That is enough to take a single room from demolition to punch list.

Plus costs $7 a month or $60 a year. It adds what a bigger or shared job needs.

$60

Free and Plus

What Free and Plus each include
FeatureFreePlus, $7 a month or $60 a year
Active projectsOneUnlimited
Budget, contingency, line itemsYesYes
Payment and receipt logYesYes
Bids side by sidenoUp to five
Change-order lognoYes
Partner on the projectnoYes
Exportable cost reportnoYes